Rooftop & package units
Transitions
Connections between openings with different dimensions.
Match the equipment opening to the duct opening. Include the equipment model, available transition length and any offset.
What to measure
- Equipment make / model
- Inlet size
- Outlet size
- Transition length
- Offset / alignment
